This project uses 168,448 540Wp photovoltaic modules and 376 196kW string inverters, with an installed capacity of 90.96MWp and a rated capacity of 73MW. The site of this project has abundant solar energy resources and good development value.
This project uses 168,448 540Wp photovoltaic modules and 376 196kW string inverters, with an installed capacity of 90.96MWp and a rated capacity of 73MW. The site of this project has abundant solar energy resources and good development value.
Dongguan Aiye Technology Investment Co., Ltd. built a 97.2KWP distributed photovoltaic project on the roof of a leased building, installed 162 600WP monocrystalline solar panels, and planned to occupy a roof area of about 808 square meters, with an average annual power generation of about 87851.57kWh.
(1) Construction scale: 1.356MW monocrystalline silicon photovoltaic power station, installation area of about 8143㎡, power generation scale of 1.356MW.
Project name: Baoan Sports Park Electric Bicycle Construction Project Construction address: Shenzhen, Guangdong Construction scale: 1 60KW car charging equipment, 3 motorcycle charging equipment Cooperation mode: self-investment and self-operation Total investment: 100,000 yuan Remarks: To be constructed