This project uses 168,448 540Wp photovoltaic modules and 376 196kW string inverters, with an installed capacity of 90.96MWp and a rated capacity of 73MW. The site of this project has abundant solar energy resources and good development value.
Dongguan Aiye Technology Investment Co., Ltd. built a 97.2KWP distributed photovoltaic project on the roof of a leased building, installed 162 600WP monocrystalline solar panels, and planned to occupy a roof area of about 808 square meters, with an average annual power generation of about 87851.57kWh.
(1) Construction scale: 1.356MW monocrystalline silicon photovoltaic power station, installation area of about 8143㎡, power generation scale of 1.356MW.
Project name: Baoan Sports Park Electric Bicycle Construction Project Construction address: Shenzhen, Guangdong Construction scale: 1 60KW car charging equipment, 3 motorcycle charging equipment Cooperation mode: self-investment and self-operation Total investment: 100,000 yuan Remarks: To be constructed